Cost Estimate

  • US$ – 

Economic Evaluation

  • EIRR –

Financing Plan

  1. To be funded by the private sector under the PPP Framework.

The High Grand Falls Multi-Purpose Reservoir is one of the LAPSSET Corridor projects planned to be on River Tana and its site is located 50 km downstream of the Kiambere Hydro Power Station along the River Tana in Kitui, Embu and Tharaka Nithi Counties. The project principle components are the High Grand Falls dam and hydro power plant with ancillary installations; and the downstream area irrigation schemes, pumping station, flood protection infrastructure and rural domestic water supply. This water supply is projected to cater for the needs of 15 million people, solving the water shortage situation in Lamu County.